Crane radius maintains safe distance from power lines (min. 20’)
Okland
Subpart CC 5. (g) pg 59
Operators, QRs and QSPs shall ensure all needed public safety measures are in place prior to the hoisting operation (e.g. closing of streets, closing of pedestrian walkways, barricading of areas, etc.).
OSHA
1926.1408(a)(2)